TURNKEY HEAVY CIVIL CONTRACTING • BONDED & INSURED TO $25M

Civil Earthmoving, 3D Grading & Site Development Divisions

We self-perform mass excavation, Trimble 3D GPS finish grading, structural demolition, deep wet/dry underground utilities, FDOT/GDOT asphalt paving, and canal dredging with our own 230+ machine yellow-iron fleet.

15,000Max Bank Cubic Yards Moved / Day
±0.02 ftTrimble 3D GPS Finish Tolerance
28 ftShored Deep Sewer & Storm Trenching
100%Self-Performed w/ Owned Yellow Iron
Mass Excavation & Cut/Fill Site Balancing
DIV-01 // MASS EARTHWORK
Daily Output Spec:8,500 – 15,000 Bank Cubic Yards (BCY) / Day
Precision Standard:±0.05 ft Rough Grade / 98% ASTM D1557 Proctor

Mass Excavation & Cut/Fill Site Balancing

High-production bulk earthmoving for distribution hubs, subdivisions, and industrial pads.

Scope & Field Execution

  • Drone LiDAR topo survey & 3D Trimble cut/fill volume modeling before mobilization
  • Organic stripping, root-mat grubbing, and unsuitable muck excavation
  • High-cycle loading with 36T–50T excavators paired with 40-ton 6x6 articulated dump trucks
  • Lift-by-lift moisture conditioning and sheepsfoot/smooth-drum nuclear density compaction

Primary Iron Deployed

CAT 336 / 349 Next Gen ExcavatorsCAT D6T / D8T DozersVolvo A40G 6x6 HaulersCS56B Padfoot Compactors

Standard Crew Composition

1 Superintendent, 2 Excavator Operators, 2 Dozer Operators, 4 Haul Truck Drivers

Turnkey Mobilized Division Rate$6,850/ 10-Hr Shift (Includes Fleet, Fuel & Crew)
Submit Civil Plans (.PDF/.CAD)
3D GPS Laser Finish Grading & Pad Prep
DIV-02 // FINISH GRADING
Daily Output Spec:45,000 – 85,000 sq ft Fine Graded & Rolled / Day
Precision Standard:±0.02 ft (±1/4 inch) 3D Robotic / GPS Tolerance

3D GPS Laser Finish Grading & Pad Prep

Sub-quarter-inch finish tolerances for warehouse slabs, curb lines, and highway sub-bases.

Scope & Field Execution

  • Direct ingestion of Civil 3D (.svd / .dxf) surface models into onboard Trimble Earthworks displays
  • Limerock, crushed aggregate base (GAB), and cement-treated base (CTB) spreading & blue-topping
  • Precision warehouse slab-on-grade vapor-barrier fine trimming with laser box blades
  • Parking lot swale profiling and ADA ramp slope compliance verification

Primary Iron Deployed

CAT 140M3 AWD Motor GradersCAT D5 / D6 VPAT Finish DozersBobcat T770 w/ Laser Box BladeCAT CB34B / CS54B Rollers

Standard Crew Composition

1 Grade Foreman, 1 Motor Grader Operator, 1 Finish Dozer Operator, 1 Roller Operator

Turnkey Mobilized Division Rate$4,450/ 10-Hr Shift (Includes Fleet, Fuel & Crew)
Submit Civil Plans (.PDF/.CAD)
Commercial Demolition & Concrete Pulverizing
DIV-03 // DEMOLITION & CRUSHING
Daily Output Spec:15,000 – 40,000 sq ft Structure / Week
Precision Standard:100% NESHAP Dust Compliance & Utility Disconnect Verification

Commercial Demolition & Concrete Pulverizing

Turnkey structural teardown, slab removal, and on-site jaw crushing into reusable #57 base.

Scope & Field Execution

  • Structural steel shearing with 360° rotating hydraulic scrap shears
  • Thick foundation slab, bridge pier, and footing breaking with 5,000 ft-lb hydraulic hammers
  • On-site concrete pulverizing and rebar magnet separation for zero-waste sub-base reuse
  • Complete underground tank, vault, and abandoned utility line extraction

Primary Iron Deployed

CAT 336 High-Reach w/ Rotating ShearCAT H140 Hydraulic BreakersMobile Jaw Crusher PlantKomatsu WA380 Loaders

Standard Crew Composition

1 Demo Superintendent, 2 High-Reach Operators, 1 Skid-Steer Crew, 3 Roll-Off Drivers

Turnkey Mobilized Division Rate$5,900/ 10-Hr Shift (Includes Fleet, Fuel & Crew)
Submit Civil Plans (.PDF/.CAD)
Deep Underground Storm, Sewer & Water Mains
DIV-04 // WET & DRY UTILITIES
Daily Output Spec:250 – 600 Linear Feet Installed & Backfilled / Day
Precision Standard:0.01% Pipe Laser Invert Slope Accuracy

Deep Underground Storm, Sewer & Water Mains

Shored trench excavation and laser-aligned pipe installation down to 28 feet.

Scope & Field Execution

  • Reinforced concrete pipe (RCP 18"–84"), HDPE storm drains, and precast box culverts
  • Deep sanitary sewer gravity mains, lift station wet wells, and ductile iron water mains
  • OSHA Subpart P trench box shielding, slide-rail shoring, and wellpoint dewatering systems
  • Compacted #57 stone bedding, haunching, and mandrel/hydrostatic pressure testing

Primary Iron Deployed

CAT 336 & 320 ExcavatorsCase 580SN Extendahoe8x20 Steel Trench Shields6" Godwin Dewatering Pumps

Standard Crew Composition

1 Pipe Foreman, 1 Mainline Excavator Operator, 1 Loader Operator, 3 Pipelayers

Turnkey Mobilized Division Rate$5,200/ 10-Hr Shift (Includes Fleet, Fuel & Crew)
Submit Civil Plans (.PDF/.CAD)
Heavy-Duty Asphalt Paving & Truck Courts
DIV-05 // PAVING & ROADWORK
Daily Output Spec:800 – 1,800 Tons Hot-Mix Asphalt (HMA) Laid / Day
Precision Standard:1/8 inch in 10 ft Straightedge Smoothness Spec

Heavy-Duty Asphalt Paving & Truck Courts

FDOT / GDOT spec Superpave asphalt surfacing, milling, and concrete curb-and-gutter.

Scope & Field Execution

  • Full-depth reclamation, cold milling, and prime/tack coat distributor application
  • Binder and structural wearing courses laid with 10–19 ft sonic-averaged electric screeds
  • Heavy-duty concrete dolly pads, dumpster pads, and extruded FDOT Type F curb & gutter
  • Thermoplastic striping, wheel stops, and signage for turnkey certificate of occupancy

Primary Iron Deployed

Roadtec RP-190e Highway PaversCAT CB34B & CB54B Double Drum RollersPneumatic 9-Wheel Finish RollersSweepers & Tack Distributors

Standard Crew Composition

1 Paving Foreman, 1 Paver Operator, 2 Screedmen, 2 Roller Operators, 3 Rakers

Turnkey Mobilized Division Rate$6,400/ 10-Hr Shift (Includes Fleet, Fuel & Crew)
Submit Civil Plans (.PDF/.CAD)
Canals, Retention Lakes, Levees & Culvert Bridges
DIV-06 // MARINE & STORMWATER
Daily Output Spec:4,000 – 9,500 yd³ Dredged or Embanked / Day
Precision Standard:USACE / Water Management District Slope & Compaction Spec

Canals, Retention Lakes, Levees & Culvert Bridges

Long-reach dredging, clay-core levee embankment, rip-rap armoring, and precast bridges.

Scope & Field Execution

  • 60-foot long-reach excavator canal dredging, aquatic bank shaping, and lake creation
  • Impervious clay-core levee construction, spillway weirs, and stormwater attenuation ponds
  • Filter fabric geotextile underlayment and heavy granite rip-rap slope armoring
  • Precast concrete arch culvert bridges, wingwalls, and headwall structures

Primary Iron Deployed

60-ft Long-Reach ExcavatorsLGP Swamp DozersVolvo A40G 6x6 ADTsHydraulic Rock Grapples

Standard Crew Composition

1 Marine Civil Foreman, 2 Long-Reach Operators, 1 Dozer Operator, 2 ADT Drivers

Turnkey Mobilized Division Rate$6,100/ 10-Hr Shift (Includes Fleet, Fuel & Crew)
Submit Civil Plans (.PDF/.CAD)
FIELD ESTIMATING TOOL // BANK TO LOOSE CUBIC YARDAGE & TRUCKLOADS

Earthwork Cut/Fill Volume & Haul Truck Calculator

Enter your excavation dimensions and soil classification to calculate Bank Cubic Yards (BCY), Loose Cubic Yards (LCY) after swell, total tonnage, and required 40-ton ADT or highway tri-axle truckloads.

Bank Volume (BCY)4,000 yd³
Loose Spoil (LCY)5,200 yd³
Estimated Weight5,800 Tons
40T 6x6 ADT Loads217 Loads
18-Yd Tri-Axle Loads289 Loads
Est. CAT 336 Crew Days1 Day